May 2016

Aerial view of Vogtle Unit 3 nuclear island and turbine island. Aerial view of Vogtle Unit 4 nuclear island and turbine island. Aerial view of the Vogtle 3 and 4 construction site. A top-down look from inside the Vogtle Unit 4 cooling tower. Construction personnel place concrete in a slip-form atop the Vogtle Unit 4 cooling tower. The Vogtle Unit 4 CA01 structural module under fabrication inside the Module Assembly Building. The Vogtle Unit 4 CA20 structural module under fabrication inside the Module Assembly Building. A sub-module wall section being lifted inside the Module Assembly Building. A side view of a sub-module wall inside the Module Assembly Building. The Vogtle Unit 4 CA02 module. The Vogtle Unit 4 CA05 module. A construction worker welds inside the Vogtle Unit 3 nuclear island. imageDeDelivery of a Vogtle Unit 3 reactor coolant pump to the construction site.scription