January 2016

A look inside containment of Unit 3. A ground-level view of CA01, which will house the two steam generators, inside containment. Shot from inside containment of Unit 3. A construction foreman oversees work with Cooling Tower 3 in the background. A craft worker tightens a bolt on the Unit 3 turbine building. A craft worker prepares to tighten bolts on Unit 3 turbine building. The platform is ready for the first course shield panels for Unit 4. Craft workers prepare an enclosure duct for concrete, Turbine Building 3 in the background. Low-pressure turbine rotors sit inside storage at the Vogtle 3 and 4 construction site. The nuclear reactor vessels sit inside storage at the Vogtle 3 and 4 construction site. Shot from the top of Unit 4 containment vessel. An aerial view of Georgia Power's 500kV transmission lines leaving the construction site. Unit 4 nuclear island before setting of containment vessel ring one. An aerial view of the Vogtle 3 and 4 construction site with labels. An aerial view of the Vogtle 3 and 4 construction site. An aerial view of Unit 4. An aerial view of Unit 3. An aerial view of Unit 3. A bird's-eye view of Unit 3 containment. Vogtle 3&4 construction overview.