October 2017

Vogtle Unit 3 nuclear island and annex building (left). Unit 3 transformer cubicles. Lift over Unit 3 auxiliary building. Unit 3 annex building. Vogtle 3 and 4 currently employs over 6,000 workers. More work fronts have opened in Unit 3 containment with both steam generators installed. Installation of the liner plates for the IRWST floor continues. Vogtle worker welds together floor liner plates in Unit 3 containment. The IWRST is a 75,300 cubic foot tank in side of containment. Looking at the Unit 3 annex building from inside Unit 3 containment. Work progresses on shield building walls around Unit 3 containment. The future Vogtle 1-4 personnel access point. River water intake pipes are installed underground at Vogtle 3 and 4. Over 400 workers known as rod busters specialize in installing rebar at Vogtle 3 and 4. Vogtle 3 and 4 continues to operate as one team, with one vision and goal. Vogtle 3 and 4 currently employs over 6,000 workers. Over 700 welders are helping build Vogtle 3 and 4. Vogtle Unit 4 containment. Vogtle 3 and 4 currently employs over 6,000 workers. Over 500 structural iron workers are helping build Vogtle 3 and 4. Vogtle Units 3 and 4. Overlooking the Vogtle 3 and construction site. Vogtle Units 3 and 4. Vogtle Units 3 and 4. Both steam generators inside of Unit 3 containment. Vogtle Unit 3 containment. Vogtle Unit 3. Vogtle Unit 3. The Lampson crane lifted both steam generators into Unit 3 containment in August and October of 2017. Vogtle Unit 3 turbine building. Unit 4 nuclear island and annex building. Vogtle Unit 4 containment. Vogtle Unit 4. Vogtle Unit 4. Vogtle Unit 4. Vogtle Unit 4 turbine building. Vogtle Unit 4. Vogtle 1-4 site.

September 2017

Crews complete a 71-hour 'super placement' of 1,844 cubic yards of concrete inside the Vogtle Unit 3 nuclear island. Crews complete a 71-hour 'super placement' of 1,844 cubic yards of concrete inside the Vogtle Unit 3 nuclear island. Vogtle Unit 3 containment vessel (left) and turbine building (right). Accumulator tank inside the Vogtle Unit 3 containment vessel. Progress continues to be made inside the Vogtle Unit 3 containment vessel. Panel installation continues on the Vogtle Unit 3 turbine building. Preparations continue for placement of the Vogtle Unit 4 CA-03 module. The 300-ton Vogtle Unit 4 deaerator was placed inside the turbine building in late September. The 300-ton Vogtle Unit 4 deaerator was placed inside the turbine building in late September. Work continues on the Vogtle Unit 3 shield building cylindrical wall. Work continues to progress on the Vogtle Unit 3 auxiliary building wall. Vogtle Unit 3 containment vessel (right) and annex building (left). Vogtle Unit 3 containment vessel. Vogtle Unit 4 turbine building. Vogtle Unit 4 CA-03 module and Unit 3 turbine building (background). Vogtle Unit 4 containment vessel (background) and turbine building (right). Vogtle Unit 4 Turbine Building. Vogtle Unit 4 CA-02 module. Construction of the Vogtle 3 and 4 river water intake structure continues. Vogtle Unit 3 containment vessel (left) and turbine building (right). Vogtle Unit 4 cooling tower.

August 2017

The KQ22 and KQ23 modules were successfully placed inside the Unit 3 containment vessel July 27, 2017. The KQ22 and KQ23 modules were successfully placed inside the Unit 3 containment vessel July 27, 2017. The CA01 Pressurizer Bay was successfully placed inside the Unit 4 containment vessel Aug. 18, 2017. The component is 60 feet tall, 40 feet wide and weighs 240,000 pounds. The first steam generator is placed inside the Vogtle Unit 3 containment vessel. The first steam generator is placed inside the Vogtle Unit 3 containment vessel. The first steam generator is lifted for placement inside the Vogtle Unit 3 containment vessel. Weighing 1.4 million pounds, the first steam generator is placed inside the Vogtle Unit 3 containment vessel. Looking from atop the Vogtle Unit 3 turbine building, the first steam generator is placed inside the Unit 3 containment vessel. Work on the Vogtle Unit 3 shield building continues. A view inside the Vogtle Unit 3 nuclear island, with annex building construction on the left. A view inside the Vogtle Unit 3 turbine building, where the turbine generators will be located. Plant Vogtle's Lampson crane prepares to lift the first steam generator for placement inside the Unit 3 containment vessel.

July 2017

Components of the Vogtle Unit 4 integrated head package. Components of the Vogtle Unit 4 integrated head package. Components of the Vogtle Unit 4 integrated head package. Components of the Vogtle Unit 4 integrated head package. Vogtle Unit 4 integrated head package. More than 6,000 workers are involved in the construction of Vogtle units 3 and 4. Piping inside the Vogtle Unit 3 turbine building. Workers prepare to place the first accumulator tank inside Vogtle Unit 3 containment. The first of two accumulator tanks is placed inside Vogtle Unit 3 containment. The first of two accumulator tanks is placed inside Vogtle Unit 3 containment. The first of two accumulator tanks is placed inside Vogtle Unit 3 containment. A look inside the Vogtle Unit 3 turbine building. The first of two steam generators is being prepared for placement inside Vogtle Unit 3 containment. More than 25,000 tons of rebar will be used to construct Vogtle units 3 and 4. Vogtle 3 and 4 construction site. Vogtle 3 and 4 construction site, with units 1 and 2 in the background. Vogtle 3 and 4 construction site. Vogtle 3 and 4 construction site. Vogtle Unit 3 nuclear island. An aerial view looking inside the Vogtle Unit 3 containment vessel. Vogtle Unit 3 containment vessel. An aerial view looking inside the Vogtle Unit 4 cooling tower. Vogtle 3 and 4 construction site. Vogtle Unit 3 nuclear island and turbine building. Vogtle Unit 3 turbine building. Vogtle Unit 3 nuclear island and turbine building. Vogtle Unit 4 nuclear island and turbine building. An aerial view of the Vogtle Unit 4 nuclear island looking inside the CA20 module. An aerial view looking inside the Vogtle Unit 4 containment vessel. Vogtle Unit 4 nuclear island and turbine building. Vogtle Unit 4 turbine building. Vogtle Unit 4 turbine building. Vogtle Unit 4 nuclear island and turbine building.

June 2017

Unit 3 cooling tower basin. Vogtle Unit 3 cooling tower pump station. Unit 3 containment. Unit 3 containment. Work outside of Unit 3 containment. Work being performed on the steam generator cavity in the Unit 3 nuclear island. More than 6,000 workers are constructing Vogtle units 3 and 4. More than 25,000 tons of rebar will be used to construct Vogtle units 3 and 4. Rebar installation continues in the Unit 3 nuclear island. Unit 3 containment. Progress continues with the Unit 3 annex building. Work being performed on the containment top head. The yellow Leihberr crane helps assemble the blue Lampson crane. Work continues in the Modular Assembly Building. Assembling of the Lampson crane. Workers preparing for a lift of structural steel. Unit 4 containment. Unit 4 containment. Inside Unit 4 containment in the area that will house the reactor vessel. The unit 4 turbine building. Vogtle 3 and 4 construction site. Vogtle 3 and 4 construction site, with units 3 and 4 in the foreground, and operating units 1 and 2 in the background. Construction of the Vogtle 3 and 4 raw water intake structure. Vogtle Unit 3 nuclear island (left) and turbine building (right). Vogtle Unit 3 nuclear island and turbine building. Vogtle Unit 3 containment vessel. Vogtle Unit 4 nuclear island (left) and turbine building (right). Vogtle Unit 4 nuclear island and turbine building. Vogtle Unit 4 containment vessel.

May 2017

Workers prepare for coating of the seam welds between the individual panels of the Vogtle Unit 3 containment vessel top head. Unit 3 shield building panels. Workers prep the Vogtle Unit 3 shield building panels for fit-up and weld-out. Integrated head package assembly inside the Vogtle 3 and 4 module assembly building. Vogtle Unit 3 nuclear island. Q233 mechanical module inside the Vogtle Unit 3 containment vessel. View from inside the Vogtle Unit 3 containment vessel. Looking inside the Vogtle Unit 3 containment vessel. Workers place concrete in Unit 3 containment to support the setting of a wall module. More than 3,300 tons of rebar were installed during the construction of Vogtle units 3 and 4 during 2016. Unit 3 nuclear island - annex building (left), containment (right). More than 25,000 tons of rebar will be used to construct Vogtle 3 and 4. More than 25,000 tons of rebar will be used to construct Vogtle units 3 and 4. More than 6,000 workers are constructing Vogtle units 3 and 4. More than 25,000 tons of rebar will be used to construct Vogtle units 3 and 4. More than 25,000 tons of rebar will be used to construct Vogtle units 3 and 4. Workers continue construction of the Vogtle Unit 4 transformer bay walls. More than 6,000 workers are constructing Vogtle units 3 and 4. Vogtle Unit 4 nuclear island, with Unit 4 cooling tower in the background. A shield building panel is installed around the Unit 4 containment vessel. Vogtle Unit 4 shield building panel installation continues. Construction of the Vogtle 3 and 4 raw water intake structure. The CB20 sub-modules will comprise the passive containment cooling water tank that sits on top of the containment vessel. Vogtle Unit 3 containment vessel. Vogtle Unit 3 containment vessel with Unit 3 cooling tower in the background. Vogtle Unit 3 containment vessel (right) and turbine building (left).

April 2017

Vogtle Unit 4 nuclear island. Inside Vogtle Unit 4 containment. Inside Vogtle Unit 4 containment. Inside Vogtle Unit 4 containment. Inside Vogtle Unit 4 containment. Vogtle Unit 4 annex building construction. CA20 module inside the Vogtle Unit 4 nuclear island. Volte Unit 4 nuclear island. Vogtle Unit 3 containment vessel (right) and turbine building. (left) with Unit 4 CA03 module in the foreground. Work continues on the Vogtle Unit 4 turbine building. Work continues on the Vogtle Unit 4 turbine building. Formwork lifted above the Vogtle Unit 3 annex building. Workers place formwork for the Vogtle Unit 3 annex building. Rebar work on the Vogtle Unit 3 auxiliary building wall. Inside Vogtle Unit 3 containment. Vogtle Unit 4 wastewater retention basin. Vogtle Unit 4 CA02 module inside the Module Assembly Building. Vogtle Unit 4 CA01 pressurizer compartment. Welding continues on the Unit 4 CA01 pressurizer compartment. Siding panel installation continues on the Vogtle Unit 3 turbine building. Vogtle Unit 3 containment vessel and turbine building. Vogtle Unit 3 cooling tower pump station. Vogtle 3 and 4 construction site Vogtle Unit 4 nuclear island (right) and turbine building (left) in foreground, with Unit 3 nuclear island and turbine building in background. Vogtle Unit 4 containment vessel Vogtle 3 and 4 construction site Vogtle Unit 3 nuclear island (right) and turbine bui8lding (left) Vogtle Unit 3 nuclear island (left) and turbine building (right) Vogtle Unit 3 containment vessel Vogtle Unit 4 nuclear island (left) and turbine building (right) Vogtle Unit 4 nuclear island (left) and turbine building (right)

March 2017

One of many support buildings under construction at the Vogtle 3 and 4 site. Shield building concrete forms inside Unit 3 nuclear island. Shield building concrete forms inside Unit 3 nuclear island. Rebar installation at the Vogtle Unit 3 nuclear island Personnel Air Lock. Work continues inside Vogtle Unit 3 containment. The CA01 module, steam generator, reactor vessel and pressurizer cavities inside Vogtle Unit 3 containment. A look inside Vogtle Unit 3 containment. A look inside Vogtle Unit 3 containment. Approximately 6,000 workers are constructing Vogtle units 3 and 4. Vogtle Unit 3 containment vessel. Vogtle Unit 3 nuclear island and shield building construction. Piping inside Vogtle Unit 3 turbine building. Structure that will support the bus ducts from the transformers to the Unit 3 turbine building. Vogtle Unit 3 nuclear island. Vogtle Unit 3 nuclear island and annex building (left). Vogtle unit 3 turbine building. Approximately 6,000 workers are constructing Vogtle units 3 and 4. Vogtle Unit 4 nuclear island and shield building construction. A look at the CA01 module (refueling canal area) inside Vogtle Unit 4 containment.

February 2017

Vogtle Unit 3 containment vessel ring 3 (center), with Unit 3 containment vessel top head (left). Vogtle Unit 3 containment vessel ring 3 Construction of Vogtle Unit 3 turbine building Vogtle Unit 3 containment vessel Vogtle Unit 3 nuclear island Vogtle Unit 3 nuclear island Refueling hatch for Vogtle Unit 3 Inside Vogtle Unit 3 containment vessel Inside Vogtle Unit 3 containment vessel Inside Vogtle Unit 3 containment vessel Inside Vogtle Unit 3 containment vessel Working inside Vogtle Unit 3 containment vessel Vogtle Unit 3 nuclear island Vogtle Unit 3 nuclear island Vogtle Unit 3 nuclear island with Unit 3 turbine building in background Vogtle Unit 3 nuclear island, with annex building construction in foreground Rebar inside the Vogtle Unit 3 containment vessel Looking up from inside the Vogtle Unit 3 turbine building Vogtle Unit 3 turbine building Vogtle Unit 3 transformers Vogtle Unit 3 nuclear island Vogtle Unit 3 steam generator B Vogtle 3&4 construction site Vogtle Unit 3 (right) and Unit 4 (left) Looking inside Vogtle Unit 3 Vogtle Unit 4 nuclear island (left) and turbine building (right) Looking inside Vogtle Unit 4 Vogtle 3&4 construction site, with operating units 1&2 on right Vogtle 3&4 construction site

January 2017

Unit 3 Nuclear Island (left) and Turbine Building (right). Construction of the Vogtle Unit 3 Annex Building. Construction of the Vogtle Unit 3 Annex Building. Construction of the Vogtle Unit 3 Annex Building. Construction of the Vogtle Unit 3 Annex Building. Construction continues on the Vogtle Unit 3 Auxiliary Building. Construction of the Vogtle Unit 3 east shield building wall continues to progress. Diesel oil storage tanks for the new Vogtle units, with Unit 3 switchyard on the left. Vogtle Unit 3 Turbine Building. Siding installation on the Vogtle Unit 3 Turbine Building. Siding installation on the Vogtle Unit 3 Turbine Building. Inside Vogtle Unit 3 containment vessel. Inside Vogtle Unit 3 containment vessel. Vogtle Unit 4 CA03 module. Vogtle Unit 4 CA02 module inside the Module Assembly Building. A worker sprays protective coating inside Vogtle containment vessel ring. Aerial view of the Vogtle 3 and 4 construction site. Aerial view of the Vogtle Unit 3 nuclear island and turbine building. Aerial view looking inside Vogtle Unit 3 containment. Aerial view of the Vogtle Unit 4 nuclear island and turbine building. Aerial view looking inside Vogtle Unit 4 containment. Aerial view of the Vogtle 3 and 4 construction site.

December 2016

An aerial view of the Vogtle 3 and 4 construction site. An aerial view looking inside Vogtle Unit 3 containment. An aerial view of the Vogtle Unit 3 nuclear island and turbine building. An aerial view of the Vogtle Unit 4 nuclear island and turbine building. An aerial view looking inside Vogtle Unit 4 containment. An aerial view of the Vogtle 3 and 4 construction site. Using the heavy lift derrick, the 2.4-million-pound Vogtle Unit 3 middle ring is placed inside the nuclear island. The 2.4-million-pound Vogtle Unit 3 middle ring is placed inside the nuclear island. The 2.4-million-pound Vogtle Unit 3 middle ring is placed inside the nuclear island. A welder works inside the Vogtle 3 and 4 Modular Assembly Building. Construction of the Communications Support Center for Vogtle units 1-4. A look inside the Vogtle Unit 3 containment vessel. Workers inside the Vogtle Unit 3 containment vessel. The top of the Vogtle Unit 3 reactor vessel is visible looking down inside containment. A look inside the Vogtle Unit 4 containment vessel. Looking up inside the Vogtle Unit 3 cooling tower. Weighing more than 2 million pounds, the Vogtle Unit 4 CA01 module is placed inside the nuclear island. Weighing more than 2 million pounds, the Vogtle Unit 4 CA01 module is placed inside the nuclear island. Weighing more than 2 million pounds, the Vogtle Unit 4 CA01 module is placed inside the nuclear island. In one of the most significant milestones to date, the Vogtle Unit 3 reactor vessel is placed inside the nuclear island. The 306-ton Vogtle Unit 3 reactor vessel is placed inside the nuclear island. The 306-ton Vogtle Unit 3 reactor vessel is placed inside the nuclear island. The 306-ton Vogtle Unit 3 reactor vessel is placed inside the nuclear island. A welder works inside the Vogtle 3 and 4 Modular Assembly Building.

November 2016

South wall removed from Module Assembly Building in preparation for Unit 4 CA01 placement Pre-fabricated concrete floor panel assembly area south of the MAB Unit 4 CA01 inside the Module Assembly Building Integrated Head Package inside the Module Assembly Building Workers assemble scaffolding around the integrated head package in the Module Assembly Building Unit 4 CA02 is assembled inside the MAB Ironworkers installing rebar on the Unit 3 Turbine Island First Bay walls Ironworkers discussing rebar installation for the Unit 3 Auxiliary Building floors in Area 2 at the 100’ elevation Unit 3 Annex Building Battery Room construction Unit 3 Annex Building Area 3 Unit 3 Annex Building Wall 3 form work installation by carpenters in preparation for concrete placement to El. 117’ Safety is the top priority on the Vogtle 3 and 4 project Unit 3 Annex building Unit 4 Unit 3 Unit 4 annex building foundation work Unit 4 nuclear island and beginning of the annex building CA04 and CA05 inside the Unit 4 containment vessel Unit 4 turbine building Unit 4 circulating water pipe Unit 3 Nuclear Island and annex building Unit 3 Annex building Unit 3 containment east side Unit 3 fuel Transfer canal section of CA01 in containment Unit 3 reactor vessel cavity and Unit 3 turbine building in the background One of two Moisture Seperator Reheaters. Both were recently installed in the Unit 3 turbine building Unit 3 turbine building Unit 3 turbine building - moisture separator reheater and feed water heaters A look at Unit 3 annex building (left) and containment (right) from the turbine building A view from EL 196' in the Unit 3 turbine building - Deaerator to right, Turbine Deck below Unit 4 tranformer pads and enclosures A Unit 4 CA03 module sits on the upender in preparation for upending at the pad Unit 4 Reactor Vessel Unit 3 Reactor Vessel is prepared for placement in late November

October 2016

An aerial view of the Vogtle 3 and 4 construction site. An aerial view of Unit 3 nuclear and turbine island with Unit 4 in the background. An aerial view of Unit 3 nuclear and turbine island with Unit 4 in the background. An aerial view looking straight down into the nuclear island and containment of Unit 3. An aerial view of Unit 4 nuclear island and turbine building. An aerial view looking straight down into the nuclear island and containment of Unit 4. Both cooling towers frame a view of the Vogtle 3 and 4 construction from an aerial perspective. Containment ring sections with the Unit 4 cooling tower in the background. The area inside the Unit 3 nuclear island where the reactor vessel will be placed. A construction team member welds equipment inside the Unit 3 nuclear island. Two iron workers safely traverse walls of rebar inside the Unit 3 nuclear island annex area. A view inside the Unit 3 nuclear island of rebar and structural steel going vertical. After a traditional Topping Out ceremony, the final roof truss is lifted to the top of the Unit 3 turbine building. The heavy lift derrick guides the final roof truss toward the Unit 3 turbine building. Workers await the final roof truss, which will raise the Unit 3 turbine building to its maximum height of 254 feet. Workers prepare to set the final roof truss atop the Unit 3 turbine building.

September 2016

Teamwork and accountability are keys to safe work practices at Vogtle 3 and 4. Work continues to progress on the Unit 3 first bay turbine building. With secure safety harnessing, a worker climbs the outer wall of the Unit 3 first bay turbine building. With a crane reaching skyward, workers scale the Unit 3 first bay turbine building. The Unit 3 containment vessel and first bay turbine building in front of the Unit 3 and 4 cooling towers. An overhead gantry crane spans the Unit 3 turbine building. From above, the Unit 3 containment vessel rises above the work site. From another perspective, the massive scale of the Unit 3 containment vessel is evident. The Unit 3 containment vessel with cooling tower in the background. To prepare for lifting and placement, the MSR is transported to the Unit 3 turbine building. Vogtle 3 and 4 is crafted with precision and pride by highly skilled workers. Sparks fly in a work yard adjacent to Unit 3. A welder inside Unit 3 is one of 6,000 skilled team members working on the site. Kiona Kuykendall is a boilermaker welding apprentice on the Vogtle 3 and 4 construction site. An on-site Nuclear Regulatory Commission inspector talks with Boilermaker Welding Apprentice Kiona Kuykendall. With the help of the massive Heavy Lift Derrick, the Moisture Separator Reheater is lifted and moved into position above the turbine building. The Heavy Lift Derrick lowers the Moisture Separator Reheater into position. The Moisture Separator Reheater is lowered into place in the turbine building. The Heavy Lift Derrick lowers the Moisture Separator Reheater into position.

August 2016

The CA20 module sits outside the MAB before it’s moved to the heavy lift derrick at Unit 4. The heavy lift derrick prepares to hook to CA20 for the lift into the Unit 4 nuclear island. The heavy lift derrick lifts the CA20 module into the Unit 4 nuclear island. The heavy lift derrick lifts the CA20 module into the Unit 4 nuclear island. The heavy lift derrick places the CA20 module into the Unit 4 nuclear island. The gantry crane is lifted and moved into the Unit 3 turbine island. Progress continues on the structural steel on the Unit 4 turbine building. Craft employees work on rebar inside Unit 3 nuclear island. Before sunrise, lights showcase CA20 prior to being hooked to the heavy lift derrick, with Unit 3 nuclear island and turbine building in the background. Workers install base-mat rebar with Unit 4 annex building and nuclear island in the background. An overhead view of the process tank in hole under CA20 prior to its placement in Unit 4 nuclear island. An elevated view of the entire Vogtle 3 and 4 construction site. An overhead view of Unit 3 containment vessel. An overhead view of Unit 4 containment vessel. A birds-eye view of the Unit 4 nuclear island, including the CA20 module on the left of containment.  An elevated view of the entire Vogtle 3 and 4 construction site. An elevated view of Unit 3 nuclear island and turbine building. An detailed look from above at Unit 3 annex building, bottom, and nuclear island, top and middle.

July 2016

Safety is the top priority during the construction of Vogtle Units 3 and 4. Teamwork and communication are among the keys to safe work practices at Vogtle 3 and 4. Unit 3 and 4 cooling towers frame the Unit 3 Nuclear Island. Feedwater heaters are mounted in the Unit 3 turbine building. Looking down from atop the Unit 3 turbine building. Construction continues at the Unit 3 nuclear island. Workers near the Unit 3 Nuclear Island. The top of the Unit 4 cooling tower is seen from inside the Unit 3 Nuclear Island. At Vogtle 3 and 4, skilled craft workers are dedicated to quality construction. The base of the massive Unit 3 cooling tower. In the Modular Assembly Building, work on the CA20 module is almost complete. Workers inspect the Unit 4 CA20 module in the Modular Assemby Building. Construction continues on the Unit 4 Turbine Building. From left, the Unit 3 cooling tower and the Unit 4 Nuclear Island. textA crane reaches toward the Unit 4 Nuclear Island. Aerial view of Vogtle Unit 3 nuclear island and turbine island. Aerial view of Vogtle Unit 3 annex building and nuclear island. Aerial view of the Vogtle Unit 3 nuclear island. Aerial view of the Vogtle Unit 3 turbine island.

June 2016

Vogtle Unit 4 CA20 structural module under fabrication in the Module Assembly Building. Workers weld a section of the Unit 4 CA01 structural module. Inside the Module Assembly Building, work continues on the Unit 4 CA20 structural module. The Unit 4 turbine building continues to take shape. Close-up view of the Unit 4 turbine building. Another perspective of the Unit 4 turbine building. From left, construction continues on the Unit 3 turbine building, nuclear island and auxiliary building. Unit 4 CA05 module is 'rigged for lift' to the heavy lift derrick. Workers set rebar at the Vogtle 3 and 4 construction site. Construction continues at the Unit 3 nuclear island. A worker sets rebar at the Vogtle 3 and 4 consruction site. Safe work practices are the first priority for workers at Vogtle 3 and 4. At sunrise, the massive Unit 4 CA05 module is ready for the meticulous lifting and placement process. The heavy lift derrick moves the 90-ton CA05 module toward the Unit 4 containment building. Guided by the heavy lift derrick, the CA05 module nears the Unit 4 containment building. Only a few feet remain until the CA05 module is set inside the containment building. Workers precisely guide the CA05 module into place inside the Unit 4 containment building. The CA05 module is set inside the Unit 4 containment building. With the Unit 4 nuclear island in the foreground, construction continues on a containment ring and turbine vessel in the distance. A bird's-eye view of Unit 3. A look down into the Unit 3 nuclear island. A look down into the Unit 4 nuclear island. An aerial shot of the entire Vogtle 3 and 4 construction site, Unit 3 on the left and Unit 4 on the right. Workers prepare the KBO4 module prior to placement inside the Unit 4 auxiliary building. The KBO4 module, the first mechanical module to be installed in Unit 4’s nuclear island, is lifted into place. Designed to process and discharge waste gas, the KBO4 module is set inside the Unit 4 auxiliary building.

May 2016

Aerial view of Vogtle Unit 3 nuclear island and turbine island. Aerial view of Vogtle Unit 4 nuclear island and turbine island. Aerial view of the Vogtle 3 and 4 construction site. A top-down look from inside the Vogtle Unit 4 cooling tower. Construction personnel place concrete in a slip-form atop the Vogtle Unit 4 cooling tower. The Vogtle Unit 4 CA01 structural module under fabrication inside the Module Assembly Building. The Vogtle Unit 4 CA20 structural module under fabrication inside the Module Assembly Building. A sub-module wall section being lifted inside the Module Assembly Building. A side view of a sub-module wall inside the Module Assembly Building. The Vogtle Unit 4 CA02 module. The Vogtle Unit 4 CA05 module. A construction worker welds inside the Vogtle Unit 3 nuclear island. imageDeDelivery of a Vogtle Unit 3 reactor coolant pump to the construction site.scription

April 2016

The first Reactor Coolant Pump arrived on site via truck. The first Reactor Coolant Pump arrived on site via truck. The first Reactor Coolant Pump arrived on site via truck and is being stored on site. Workers pour concrete at the base of CA01 inside containment of Unit 3. Workers placed all six of the third course shield building panels for Unit 3. Workers placed all six of the third course shield building panels for Unit 3. Workers placed all six of the third course shield building panels for Unit 3. Workers pour concrete as part of the 87-foot, 6-inch placement in the east side of containment of Unit 3. A shot from the top of Unit 3 containment looking at the turbine and annex buildings. Unit 4 nuclear island and turbine building. Unit 3 from the ground level looking up. The transmission banks near Unit 3 turbine building. Workers secure a third course shield building panel on Unit 3. Unit 4 nuclear island and turbine building. A look inside containment of Unit 4. Unit 4 turbine building. CA04 in the construction site between units 3 and 4. Workers fill the second course shield building panels with concrete at Unit 3. Birds-eye view of the Vogtle 3 and 4 construction site. Birds-eye view of Unit 4 nuclear island. Birds-eye view of Unit 3 nuclear island.

March 2016

The heavy lift derrick moves the upper condenser shell and places it in the Unit 4 turbine building. The heavy lift derrick moves the upper condenser shell and places it in the Unit 4 turbine building. The heavy lift derrick begins to move the upper condenser shell for the Unit 4 turbine building. A closer view of the upper condenser shell for the Unit 4 turbine building. Workers weld the containment vessel top head for Unit 3. A worker welds a portion of the containment vessel top head for Unit 3. Progress continues on Unit 4 CA20 inside the Modular Assembly Building. Progress continues on Unit 4 CA01 inside the Modular Assembly Building. Steel beams are ready for placement at Unit 3 turbine building. A look at the Unit 3 nuclear island from the turbine building. An elevated view of Engineering Support Building from Unit 3 turbine building. An elevated view of Unit 3 containment from the turbine building. An elevated view of Unit 3 containment and annex building from the turbine building. of progress on the concrete walls protecting the transformers. Rebar for the shield building and CA20 in Unit 4 nuclear island. A look inside containment of Unit 4. The heavy lift derrick begins to move the upper condenser shell for the Unit 4 turbine building. Progress on the condensate tank foundation continues near the Unit 4 turbine building. An elevated view of Vogtle units 1-4. An elevated view of the Vogtle 3 and 4 cooling towers. The sun sets behind the Vogtle 1 and 2 cooling towers near the 3 and 4 construction site.

February 2016

Workers discuss the welding of portions of the top head of Unit 3 containment. Steel beams reach towards the sky on Unit 4 turbine building. A view of the Unit 4 turbine building with containment and cooling tower in background. A look inside Unit 4 containment. Rebar inside containment of Unit 4. A look inside containment of Unit 4. A pedestal that will help support one of the steam generators inside Unit 4 containment. A Fluor employee works on the Unit 3 turbine building. A look at the Unit 3 nuclear island from the turbine building. A craft worker welds one of the second course shield panels of Unit 3. A view of the Unit 3 annex building with CA20 and containment on the left. A look at CA20 from the containment vessel ring of Unit 3. Major components of the Unit 3 containment vessel sit just outside nuclear island. Hundreds of cars of the 5,700 craft workers sit in the main parking lot of the construction site.

January 2016

A look inside containment of Unit 3. A ground-level view of CA01, which will house the two steam generators, inside containment. Shot from inside containment of Unit 3. A construction foreman oversees work with Cooling Tower 3 in the background. A craft worker tightens a bolt on the Unit 3 turbine building. A craft worker prepares to tighten bolts on Unit 3 turbine building. The platform is ready for the first course shield panels for Unit 4. Craft workers prepare an enclosure duct for concrete, Turbine Building 3 in the background. Low-pressure turbine rotors sit inside storage at the Vogtle 3 and 4 construction site. The nuclear reactor vessels sit inside storage at the Vogtle 3 and 4 construction site. Shot from the top of Unit 4 containment vessel. An aerial view of Georgia Power's 500kV transmission lines leaving the construction site. Unit 4 nuclear island before setting of containment vessel ring one. An aerial view of the Vogtle 3 and 4 construction site with labels. An aerial view of the Vogtle 3 and 4 construction site. An aerial view of Unit 4. An aerial view of Unit 3. An aerial view of Unit 3. A bird's-eye view of Unit 3 containment. Vogtle 3&4 construction overview.

December 2015

PLANT VOGTLE  12/2015 PLANT VOGTLE  12/2015 PLANT VOGTLE  12/2015 PLANT VOGTLE  12/2015 PLANT VOGTLE  12/2015 PLANT VOGTLE  12/2015 PLANT VOGTLE  12/2015 PLANT VOGTLE  12/2015 PLANT VOGTLE  12/2015 PLANT VOGTLE  12/2015 PLANT VOGTLE  12/2015 PLANT VOGTLE  12/2015 PLANT VOGTLE  12/2015

November 2015

PLANT VOGTLE  11/2015 PLANT VOGTLE  11/2015 PLANT VOGTLE  11/2015 PLANT VOGTLE  11/2015 PLANT VOGTLE  11/2015 PLANT VOGTLE  11/2015 PLANT VOGTLE  11/2015 PLANT VOGTLE  11/2015 PLANT VOGTLE  11/2015 PLANT VOGTLE  11/2015 PLANT VOGTLE  11/2015 PLANT VOGTLE  11/2015 PLANT VOGTLE  11/2015

October 2015

PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014

September 2015

PLANT VOGTLE  9/2014 PLANT VOGTLE  9/2014 PLANT VOGTLE  9/2014 PLANT VOGTLE  9/2014 PLANT VOGTLE  9/2014 PLANT VOGTLE  9/2014 PLANT VOGTLE  9/2014 PLANT VOGTLE  9/2014 PLANT VOGTLE  9/2014 PLANT VOGTLE  9/2014 PLANT VOGTLE  9/2014 PLANT VOGTLE  9/2014 PLANT VOGTLE  9/2014 PLANT VOGTLE  9/2014 PLANT VOGTLE  9/2014 PLANT VOGTLE  9/2014 PLANT VOGTLE  9/2014 PLANT VOGTLE  9/2014

August 2015

PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014

July 2015

PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014 PLANT VOGTLE  7/2014

June 2015

PLANT VOGTLE  6/2014 PLANT VOGTLE  6/2014 PLANT VOGTLE  6/2014 PLANT VOGTLE  6/2014 PLANT VOGTLE  6/2014 PLANT VOGTLE  6/2014 PLANT VOGTLE  6/2014 PLANT VOGTLE  6/2014 PLANT VOGTLE  6/2014 PLANT VOGTLE  6/2014 PLANT VOGTLE  6/2014 PLANT VOGTLE  6/2014 PLANT VOGTLE  6/2014 PLANT VOGTLE  6/2014 PLANT VOGTLE  6/2014 PLANT VOGTLE  6/2014 PLANT VOGTLE  6/2014 PLANT VOGTLE  6/2014

May 2015

PLANT VOGTLE  5/2015 PLANT VOGTLE  5/2015 PLANT VOGTLE  5/2015 PLANT VOGTLE  5/2015 PLANT VOGTLE  5/2015 PLANT VOGTLE  5/2015 PLANT VOGTLE  5/2015 PLANT VOGTLE  5/2015 PLANT VOGTLE  5/2015 PLANT VOGTLE  5/2015 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014 PLANT VOGTLE  5/2014

April 2015

PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015 PLANT VOGTLE  4/2015

March 2015

PLANT VOGTLE  3/2014 PLANT VOGTLE  3/2014 PLANT VOGTLE  3/2014 PLANT VOGTLE  3/2014 PLANT VOGTLE  3/2014 PLANT VOGTLE  3/2014 PLANT VOGTLE  3/2014 PLANT VOGTLE  3/2014 PLANT VOGTLE  3/2014 PLANT VOGTLE  3/2014 PLANT VOGTLE  3/2014 PLANT VOGTLE  3/2014 PLANT VOGTLE  3/2014 PLANT VOGTLE  3/2014 PLANT VOGTLE  3/2014 PLANT VOGTLE  3/2014 PLANT VOGTLE  3/2014 PLANT VOGTLE  3/2014 PLANT VOGTLE  3/2014 PLANT VOGTLE  3/2014 PLANT VOGTLE  3/2014 PLANT VOGTLE  3/2014 PLANT VOGTLE  3/2014

February 2015

PLANT VOGTLE  2/2014 PLANT VOGTLE  02/2014 PLANT VOGTLE  02/2014 PLANT VOGTLE  02/2014 PLANT VOGTLE  02/2014 PLANT VOGTLE  02/2014 PLANT VOGTLE  02/2014 PLANT VOGTLE  02/2014 PLANT VOGTLE  02/2014 PLANT VOGTLE  02/2014 PLANT VOGTLE  02/2014 PLANT VOGTLE  02/2014 PLANT VOGTLE  02/2014 PLANT VOGTLE  02/2014 PLANT VOGTLE  02/2014 PLANT VOGTLE  02/2014 PLANT VOGTLE  02/2014 PLANT VOGTLE  02/2014 PLANT VOGTLE  02/2014

January 2015

PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014 PLANT VOGTLE  01/2014

December 2014

PLANT VOGTLE 12/2014 PLANT VOGTLE 12/2014 PLANT VOGTLE 12/2014 PLANT VOGTLE 12/2014 PLANT VOGTLE 12/2014 PLANT VOGTLE 12/2014 PLANT VOGTLE 12/2014 PLANT VOGTLE 12/2014 PLANT VOGTLE 12/2014 PLANT VOGTLE 12/2014 PLANT VOGTLE 12/2014 PLANT VOGTLE 12/2014 PLANT VOGTLE 12/2014 PLANT VOGTLE 12/2014 PLANT VOGTLE 12/2014

November 2014

PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014 PLANT VOGTLE 11/2014

October 2014

PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014 PLANT VOGTLE 10/2014

September 2014

PLANT VOGTLE 9/2014 PLANT VOGTLE 9/2014 PLANT VOGTLE 9/2014 PLANT VOGTLE 9/2014 PLANT VOGTLE 9/2014 PLANT VOGTLE 9/2014 PLANT VOGTLE 9/2014 PLANT VOGTLE 9/2014 PLANT VOGTLE 9/2014 PLANT VOGTLE 9/2014 PLANT VOGTLE 9/2014 PLANT VOGTLE 9/2014 PLANT VOGTLE 9/2014 PLANT VOGTLE 9/2014 PLANT VOGTLE 9/2014 PLANT VOGTLE 9/2014 PLANT VOGTLE 9/2014 PLANT VOGTLE 9/2014 PLANT VOGTLE 9/2014

August 2014

PLANT VOGTLE 8/2014 PLANT VOGTLE 8/2014 PLANT VOGTLE 8/2014 PLANT VOGTLE 8/2014 PLANT VOGTLE 8/2014 PLANT VOGTLE 8/2014 PLANT VOGTLE 8/2014 PLANT VOGTLE 8/2014 PLANT VOGTLE 8/2014 PLANT VOGTLE 8/2014 PLANT VOGTLE 8/2014 PLANT VOGTLE 8/2014 PLANT VOGTLE 8/2014 PLANT VOGTLE 8/2014 PLANT VOGTLE 8/2014 PLANT VOGTLE 8/2014 PLANT VOGTLE 8/2014 PLANT VOGTLE 8/2014 PLANT VOGTLE 8/2014 PLANT VOGTLE 8/2014 PLANT VOGTLE 8/2014

July 2014

PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014 PLANT VOGTLE 7/2014

June 2014

PLANT VOGTLE 6/2014 PLANT VOGTLE 6/2014 PLANT VOGTLE 6/2014 PLANT VOGTLE 6/2014 PLANT VOGTLE 6/2014 PLANT VOGTLE 6/2014 PLANT VOGTLE 6/2014 PLANT VOGTLE 6/2014 PLANT VOGTLE 6/2014 PLANT VOGTLE 6/2014 PLANT VOGTLE 6/2014 PLANT VOGTLE 6/2014 PLANT VOGTLE 6/2014 PLANT VOGTLE 6/2014 PLANT VOGTLE 6/2014 PLANT VOGTLE 6/2014 PLANT VOGTLE 6/2014 PLANT VOGTLE 6/2014 PLANT VOGTLE 6/2014 PLANT VOGTLE 6/2014 PLANT VOGTLE 6/2014 PLANT VOGTLE 6/2014 PLANT VOGTLE 6/2014

May 2014

PLANT VOGTLE 5/2014 PLANT VOGTLE 5/2014 PLANT VOGTLE 5/2014 PLANT VOGTLE 5/2014 PLANT VOGTLE 5/2014 PLANT VOGTLE 5/2014 PLANT VOGTLE 5/2014 PLANT VOGTLE 5/2014 PLANT VOGTLE 5/2014 PLANT VOGTLE 5/2014 PLANT VOGTLE 5/2014 PLANT VOGTLE 5/2014 PLANT VOGTLE 5/2014 PLANT VOGTLE 5/2014 PLANT VOGTLE 5/2014 PLANT VOGTLE 5/2014 PLANT VOGTLE 5/2014 PLANT VOGTLE 5/2014 PLANT VOGTLE 5/2014 PLANT VOGTLE 5/2014 PLANT VOGTLE 5/2014 PLANT VOGTLE 5/2014 PLANT VOGTLE 5/2014 PLANT VOGTLE 5/2014 PLANT VOGTLE 5/2014

April 2014

PLANT VOGTLE 4/2014

March 2014

February 2014


January 2014


December 2013

PLANT VOGTLE 12/2013

November 2013

October 2013

September 2013

August 2013

July 2013

June 2013

May 2013

April 2013

March 2013

February 2013

January 2013

December 2012

November 2012

October 2012

September 2012

August 2012

July 2012

June 2012

May 2012

April 2012

March 2012

February 2012

January 2012

December 2011

November 2011

October 2011

August 2011

July 2011

June 2011

March 2011

January 2011

November 2010

September 2010

August 2010

July 2010

April 2010

March 2010

February 2010

January 2010

December 2009

October 2009

August 2009

July 2009